Thursday, June 1, 2017

New parking lot well underway at Kinghorn

 Photos by Barry Wallace
Included here are a half dozen photographs showing the construction of the new parking lot being constructed at the rear of the King Heritage & Cultural Centre, on the King Road at Kinghorn.   The surface of the parking lot will feature the latest technology in hard surfacing that is porous for rainwater run-off to be drained and absorbed below the surface.   The prefabricated parking surface panels are seen in the photo below, stacked and waiting to be installed   The job is expected to be completed by the end of June and will add 35 parking spots for automobiles.








Please comment if you wish.
Barry Wallace

1 comment:

  1. Parking was an issue, hope with this they will be able to have more visitors. Most likely the green space needed to be sacrificed.

    ReplyDelete