Photos by Barry Wallace
The much-anticipated paved parking lot at the King Cultural & Heritage Centre became a reality this week. Much-needed additional parking at the rear of the centre will be installed later in 2016 and will feature hard-surfaced but water-permeable paving to supplement rainwater draining from the lot.
Please comment if you wish.
Barry Wallace
No comments:
Post a Comment